DD101 LONG LEAD
View detailed technical data, stock status, and sourcing information for: DD101 LONG LEAD
DODParts.com distributes related products varnishes dopes paints, aircraft parts and consumables, electrical parts, fittings and other components for the aerospace and defense industries. Submit the short price quote form for part DD101 LONG LEAD to receive an up to date pricing and availability quote by email.
w/o mtg facilities, radial terminals body style, 0.156 inches maximum body length, not established reliability indicator, 0.290 inches maximum body diameter, 1.500 inches minimum terminal length
Product Characteristics
Below you’ll find the complete technical specifications and performance data for this part, including material details and compliance information.
- Body Style
- w/o mtg facilities, radial terminals
- Reliability Indicator
- not established
- Terminal Length
- 1.500 inches minimum
- Body Diameter
- 0.290 inches maximum
- Body Length
- 0.156 inches maximum
- Center To Center Distance Between Terminals Parallel To Diameter
- 0.250 inches nominal
- Terminal Diameter
- 0.025 inches nominal
- Schematic Diagram Designator
- no common or grounded electrode(s)
- End Item Identification
- missile, ai-to-air, phoeb=nix (aim-54); teletype, model 28; test consoles, mini-sace; engine, aircraft tf33-pw-102 (c-135e, ec-135h/k/p); missile, air-to-air, sparrow (aim-7); support equipment, mx peacekeeper missile; support equipment, b-52 aircraft; missile, all-weather antiship, harpoon (agm-84); support equipment, b-1 aircraft
- Capacitance Value Per Section
- 100.000 picofarads single section
- Voltage Temp Limits Per Section In Percent Capacitance Change
- -56.0 to 22.0 without voltage applied single section
- Nonderated Operating Temp
- -55.0 celsius minimum and 85.0 celsius maximum
- Nonderated Continuous Voltage Rating And Type Per Section
- 1000.0 dc single section
- Criticality Code Justification
- feat
- Tolerance Range Per Section
- -10.00 to 10.00 percent single section
- Insulation Resistance At Reference Temp
- 10000.0 megohms
- Terminal Surface Treatment
- solder
- Special Features
- weapon system essential
- Material
- plastic case
- Terminal Type And Quantity
- 2 uninsulated wire lead
Replaces National Stock Numbers
Below is a list of NSNs that have been officially superseded by this NSN:
| NSN | Name | Date |
|---|---|---|
| 5910-00-080-9088 | No Name Available | 04/13/1966 |
| 5910-00-732-3695 | No Name Available | 03/07/1973 |
| 5910-00-752-4696 | No Name Available | 01/01/1960 |
| 5910-00-752-4893 | No Name Available | 01/01/1960 |
| 5910-00-752-4896 | No Name Available | 04/18/1966 |
| 5910-00-840-8164 | No Name Available | 05/01/1976 |
| 5910-01-090-6965 | No Name Available | 12/01/1981 |
Related Parts
This NSN group includes multiple components designed to meet specific performance and operational standards. Each listing provides detailed specs, functionality data, and replacement compatibility information:
| Part Number | Name |
|---|---|
| 002-1024 | Ceramic Dielectr Fixed Capacitor |
| 015-3-01-010 | Ceramic Dielectr Fixed Capacitor |
| 0160-2061 | Ceramic Dielectr Fixed Capacitor |
| 064-064 | Ceramic Dielectr Fixed Capacitor |
| 080D86300 | Ceramic Dielectr Fixed Capacitor |
| 0838000X5U0 101K | Ceramic Dielectr Fixed Capacitor |
| 108-703-1019 | Ceramic Dielectr Fixed Capacitor |
| 2201010 | Ceramic Dielectr Fixed Capacitor |
| 254-100500-027 | Ceramic Dielectr Fixed Capacitor |
| 2DDT60N101KAA | Ceramic Dielectr Fixed Capacitor |
| 60S3L101K1KV | Ceramic Dielectr Fixed Capacitor |
| 610475 | Ceramic Dielectr Fixed Capacitor |
| 651-100003-027 | Ceramic Dielectr Fixed Capacitor |
| 804103-101 | Ceramic Dielectr Fixed Capacitor |
| 838-000X5U0-101K | Ceramic Dielectr Fixed Capacitor |
| C0201 | Ceramic Dielectr Fixed Capacitor |
| DD-101 | Ceramic Dielectr Fixed Capacitor |
| DD101 | Ceramic Dielectr Fixed Capacitor |
| DD101 LONG LEAD | Ceramic Dielectr Fixed Capacitor |
| L10T1 | Ceramic Dielectr Fixed Capacitor |
| LA10T1S3 | Ceramic Dielectr Fixed Capacitor |
| M048-101-00-3 | Ceramic Dielectr Fixed Capacitor |
FAQs
Find helpful answers about installation, operation, maintenance, compliance, and troubleshooting.
What is the FSCG of the NSN 5910-00-678-8157?
Does the NSN 5910-00-678-8157 have a Schedule B code assigned?
Does NSN 5910-00-678-8157 require demilitarization?
Does NSN 5910-00-678-8157 contain precious materials?
Does NSN 5910-00-678-8157 contain hazardous materials?
When the NSN 5910-00-678-8157 was assigned to the Federal Catalog?
Professional Distribution
Certified to meet the strict requirements of defense, aerospace, and hazardous materials distribution.
- ITAR Registered
- DDTC Registered
- HAZMAT Certified
- AS9120 Quality Standards
- 100% Quality Inspections
You May Also Like
Browse other in-demand NSN parts sourced by professionals in defense, aerospace, and manufacturing sectors. Each component meets strict standards for quality and performance.
Pricing
Submit your request below and our team will respond quickly with up-to-date pricing, delivery estimates, and stock information: